2024-03-29
http://w3.windfair.net/wind-energy/news/43221-eew-spc-monopile-pridtcion-wind-turbine-wind-farm-vineyard-wind-usa-rostock-germany-tons-record

EEW SPC breaks own record

Image: EEW SPCImage: EEW SPC
Their heaviest monopile so far has left EEW SPC’s production facility in Germany. It will be shipped to the U.S. to be installed in Vineyard Wind 1.

Official Press Release EEW SPC:

Heaviest monopile leaves EEW SPC’s Production Hall

Wind Industry Profile of
Heaviest monopile leaves EEW SPC’s Production Hall

EEW Special Pipe Constructions GmbH has broken its own previous heaviest monopile record which itself was achieved as recently as July 2022. But this record has already been superseded - at 1,895 tons, the heaviest monopile in EEW's history was produced on the Rostock site at the end of January.

This monopile is part of the order for the 800 MW Vineyard Wind 1 wind farm, which will be the first commercial offshore wind farm in the USA. In total, EEW SPC will process over 98,000 tons of steel into monopiles by the summer of 2023. The monopiles will each have a diameter of 9.6 meters with a maximum length of 85 meters. Vineyard Wind 1 will be built some 15 miles off the coast of Massachusetts. It is anticipated that the wind farm will deliver first power... ... More: Official Press Release EEW SPC

Keywords:
EEW SPC; monopile, pridtcion, wind turbine, wind farm, Vineyard Wind, USA, Rostock, Germany, tons, record







Thematically suitable Windfair.net members in the business directory

  • Newlist_kaeufer_logo
  • Newlist_logo.windfair-us
  • Newlist_logo.drakawind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020