2024-12-22
https://w3.windfair.net/wind-energy/news/41144-deutsche-windtechnik-eneco-wind-farm-offshore-component-exchange-netherlands-dutch-prinses-amalia-gearbox-generator-service-deployment

Deutsche Windtechnik signs agreement for major component exchanges at Dutch OWP

The 5-year contract covers the deployment of highly skilled personnel and the specific tooling and equipment needed to carry out exchanges of major components.

Official Press Release Deutsche Windtechnik:

Eneco and Deutsche Windtechnik sign 5-year agreement for major component exchanges at the OWP Prinses Amaliawindpark

Wind Industry Profile of
Eneco and Deutsche Windtechnik sign 5-year agreement for major component exchanges at the OWP Prinses Amaliawindpark

Wind farm owner Eneco has assigned Deutsche Windtechnik to perform major component exchanges in the Dutch offshore wind farm Prinses Amalia during a period of five years, starting in August.

The wind farm is composed of 60 Vestas V80 wind turbines. The contract covers the deployment of highly skilled personnel and the specific tooling and equipment needed to carry out exchanges of major components. During the coming five years, up until the end of the designed lifetime, campaigns will be carried out once or twice a year using a jack-up vessel to replace multiple large components, including  gearboxes and generators but also rotor blades if needed. First deployment of highly skilled personnel in August The first deployment is scheduled for mid-August... ... More: Official Press Release Deutsche Windtechnik

Keywords:
Deutsche Windtechnik, Eneco, wind farm, offshore, component exchange, Netherlands, Dutch, Prinses Amalia, gearbox, generator, service, deployment







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.windfair-us
  • Newlist_logo.drakawind
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020