2024-11-05
http://w3.windfair.net/wind-energy/news/39352-vestas-invenergy-us-usa-illinois-sapphire-sky-wind-farm-wind-energy-wind-power

News Release from windfair.net

List_windfair_logo_pos

Wind Industry Profile of


New US deal for Vestas: 235 MW Invenergy order

The Sapphire Sky wind project in Illinois will consist of V150-4.2 MW turbines and V136-3.45 MW turbines in 3.6 MW operating mode. Turbine delivery will begin in Q2 of 2022 with commissioning scheduled for Q4.

Supply and commissioning of the turbines comes with this new order including a 10-year Active Output Management 5000 (AOM 5000) service agreement.

“We are pleased to partner once again with Invenergy, a global leader in sustainable energy, and expand the renewable energy sector in Illinois with the Sapphire Sky project,” said Laura Beane, President of Vestas North America.

"As a leader in wind operations, it’s partnerships like our engagement with Vestas that ensure we continue to develop a best-in-class fleet. At Invenergy, safety, efficiency, and operational excellence are top of mind throughout the construction process and we pride ourselves on working with project partners that share those same goals. We look forward to deepening our investment and footprint in our home state of Illinois alongside Vestas,” said Bryan Schueler, Executive Vice President and Construction Business Leader.

Source:
Windfair/Vestas
Author:
Windfair editors
Email:
press@windfair.net
Keywords:
vestas, invenergy, US, USA, Illinois, Sapphire Sky, wind farm, wind energy, wind power



All news from windfair.net

List_windfair_logo_pos

news in archive


Thematically suitable Windfair.net members in the business directory

  • Newlist_kaeufer_logo
  • Newlist_logo.windfair-us

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020