2024-12-22
https://w3.windfair.net/wind-energy/news/38593-van-oord-italy-offshore-installation-vessel-turbine-ming-yang-mw-mediterranean-sea-taranto-mpi-resolution-pile-driving

News Release from windfair.net

List_windfair_logo_pos

Wind Industry Profile of


Van Oord to install Italy's first offshore wind farm

Van Oord’s MPI Resolution vessel will install the 10 turbines for the Taranto Offshore Wind Farm in Italy. Once installed it will be the first offshore wind farm in the Mediterranean Sea.

The Taranto wind farm will have a capacity of 30 MW and an estimated output of 58,000 MWh per year. It is located near the harbour of Taranto, Italy and will be equipped with turbines by Chinese manufacturer Ming Yang Smart Energy.

This week the MPI Resolution has set sail to Italy to install the monopiles, secondary steel and the wind turbines generators, Van Oord said. The vessel is perfectly suitable for the works in the Mediterranean Sea because it can handle both the very shallow and deeper water locations as water depths vary from 4 to 18 metres. During the pile driving activities, Van Oord deploys its innovative FaunaGuard system. This acoustic device deters dolphins by using special underwater acoustics.

Source:
Van Oord
Author:
Windfair Editors
Email:
press@windfair.net
Keywords:
Van Oord, Italy, offshore, installation, vessel, turbine, Ming Yang, MW, Mediterranean Sea, Taranto, MPI Resolution, pile driving



All news from windfair.net

List_windfair_logo_pos

news in archive


Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_kaeufer_logo
  • Newlist_pce-instruments-logo-300dpi
  • Newlist_logo.windfair-us
  • Newlist_logo.drakawind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020