Posted by: Windfair Editors
OX2 hands over Swedish wind farm to Octopus Renewables
Official Press Release OX2:
OX2 hands over the Ljungbyholm wind farm in Sweden to Octopus Renewables
On June 30, OX2 commissioned and handed over the 48 MW Ljungbyholm wind farm in the municipality of Kalmar, Sweden, to Octopus Renewables Infrastructure Trust plc (ORIT).
On March 11, 2020, OX2 communicated that an agreement was signed with ORIT, to build a wind farm with a total of 12 turbines in the municipality of Kalmar, Sweden. OX2 has developed and constructed the wind farm based on a tailored EPC agreement towards ORIT. The wind farm is now commissioned and is expected to produce 150 GWh per year, which corresponds to the electricity consumption for 30,000 households. OX2 has the responsibility for the technical and commercial management of the wind farm. Hillevi Priscar, Country Manager OX2 Sweden says: "I am satisfied that OX2 can connect with... ... More: Official Press Release OX2
- Keywords:
- OX2, Octopus Renewables, wind farm, Sweden, onshore, developer, installation, hand over, ORIT, turbine, Nordex