2024-12-23
https://w3.windfair.net/wind-energy/news/36531-repsol-ibereolica-renovables-wind-farm-onshore-chile-commissioning-construction-mw-phase-turbine-nacelle-installation-supply-electricity

Repsol and Grupo Ibereólica Renovables Advance Construction of 189 MW Cabo Leones III Project

The first phase of the project is already up and running

Official Press Release Repsol:

Repsol and Ibereólica Renovables advance in the construction of their first joint wind farm in Chile

Wind Industry Profile of
Repsol and Ibereólica Renovables advance in the construction of their first joint wind farm in Chile

Nacelles for the wind turbines for the 189 MW Cabo Leones III project, located in the Atacama region of Chile, leave the port of Bilbao / The first phase of this wind farm, with 79 MW of installed power, begins commercial operation

Repsol and Grupo Ibereólica Renovables are moving forward in the construction of their first joint wind farm in Chile, called Cabo Leones III with 189 MW of installed capacity, with the shipment from the port of Bilbao of the main technological components for its wind turbines and the beginning of commercial operation of the first phase of this project in December last year. Repsol CEO Josu Jon Imaz and the Chairman of Grupo Ibereólica Renovables, Gregorio Álvarez, today led a ceremony prior to the departure from Bilbao... ... More: Official Press Release Repsol

Keywords:
Repsol, Ibereólica Renovables, wind farm, onshore, Chile, commissioning, construction, MW, phase, turbine, nacelle, installation, supply, electricity







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020