2024-12-22
https://w3.windfair.net/wind-energy/news/36061-ore-catapult-research-offshore-cable-failure-submarine-collaboration-industry-sector-downtime-cable-repair-insurance-costs-electrode

Participants Wanted

The Offshore Renewable Energy (ORE) Catapult is urging the offshore wind sector to sign up to a world-first data collection platform that aims to vastly reduce subsea cable failures which account for the single biggest insurance cost for the industry

Official Press Release ORE Catapult:

Offshore wind leaders urged to collaborate for radical advances to reduce subsea cable failures

Wind Industry Profile of
Offshore wind leaders urged to collaborate for radical advances to reduce subsea cable failures

The Offshore Renewable Energy (ORE) Catapult is urging the offshore wind sector to sign up to a world-first data collection platform that aims to vastly reduce subsea cable failures.

In a global industry first, ELECTRODE will track cable failure trends and service downtime, as well as the effectiveness of current methods of monitoring, detection and response. Subsea cable failures account for the single biggest insurance cost for the industry, making up 75-80 per cent of claims in the UK. It can take an average of two months to repair a failed cable, costing more than £10 million in costs and lost power generation. To date, efforts to reduce failures have been hampered by a lack of available data, but ORE Catapult, the UK’s leading... ... More: Official Press Release ORE Catapult

Keywords:
ORE Catapult, research, offshore, cable failure, submarine, collaboration, industry, sector, downtime, cable, repair, insurance costs, ELECTRODE







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind
  • Newlist_pce-instruments-logo-300dpi
  • Newlist_logo.windfair-us
  • Newlist_logo.remchem

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020