Posted by: Windfair Editors
Vestas Replaces Senvion as EPC Contractor in Australia
Official Press Release Vestas:
Vestas secures 86 MW EPC deal with Nexif Energy to extend Lincoln Gap Wind Farm in Australia
Vestas has signed an 86 MW contract with Nexif Energy for the second stage of the Lincoln Gap Wind Farm in South Australia. The EPC agreement will include the engineering, procurement and construction of 24 of Vestas’ V136-3.45 MW turbines delivered in 3.6 MW Power Optimised Mode. This will add to the customer’s existing fleet of 126 MW of Senvion turbines which are being serviced by Vestas.
By replacing Senvion as the EPC contractor, the project is on course to successfully meet Nexif Energy’s long-term sustainable goals for South Australia. Upon completion, Vestas will commence a 20-year Active Output Management 5000 (AOM 5000) service agreement for the new turbines. This is designed to maximise energy production for the lifetime of the project. With an energy-based... ... More: Official Press Release Vestas
- Keywords:
- Vestas, Australia, Lincoln Gap, wind farm, onshore, turbine, EPC, Nexif Energy, extension, Senvion, service, maintenance, replacement