2024-11-05
http://w3.windfair.net/wind-energy/news/34732-endiprev-block-island-usa-offshore-wind-farm-maintenance-service-america-workforce-coronavirus-ge-renwable-energy

Block Island Maintenance Campaign Starts Now

The Endiprev team returns to the Block Island Offshore Wind Farm in the U.S.

Official Press Release Endiprev:

US offshore wind: Block Island maintenance campaign

Endiprev team returns to the Block Island Offshore Wind Farm to perform a maintenance campaign, with 100% American workforce.

Last week, the Endiprev USA team started working on the Block Island Offshore Wind Farm. This project scope is to perform a mechanical and electrical retrofit, and support on the summer’s preventive maintenance campaign. We have been working on the US offshore wind market since its beginning. Endiprev USA assisted the GE Renewable Energy team in all phases of the Block Island Wind Farm commissioning. After the commissioning, our team continued to work there, performing a major repair operation, and the preventive and corrective maintenance until September 2017. Specialized American workforce This time around, the... ... More: Official Press Release Endiprev

Keywords:
Endiprev, Block Island, USA, offshore, wind farm, maintenance, service, America, workforce, coronavirus, GE Renwable Energy







Thematically suitable Windfair.net members in the business directory

  • Newlist_kaeufer_logo
  • Newlist_logo.drakawind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020