2024-03-29
http://w3.windfair.net/wind-energy/news/34495-india-wind-energy-capacity-intesify-government-revive-auction-construction-grid-infrastructure-barriers

Report: India’s Total Wind Energy Capacity Could Reach 50 GW by 2022

Image: PixabayImage: Pixabay
Efforts by the government to lower barriers around market design, grid infrastructure and land allocation must be intensified to reach that target though.

Official Press Release GWEC:

India must intensify policy reforms to revive wind growth beyond 50 GW by 2022: GWEC and MEC+

Wind Industry Profile of
India must intensify policy reforms to revive wind growth beyond 50 GW by 2022: GWEC and MEC+

India likely to undershoot target by up to 10GW if urgent regulatory challenges are not addressed

According to a new report released today by the Global Wind Energy Council (GWEC) and MEC+ (MEC Intelligence), India’s wind energy capacity can only realistically reach 50 GW by 2022. India Wind Outlook Towards 2022: Looking beyond the headwinds objectively analyses the factors which have led to a drag on market growth for India’s wind energy industry over the past two years, and provides an assessment on the forecast along with a pathway to overcome these challenges to realise the high potential of... ... More: Official Press Release GWEC

Keywords:
India, wind energy, capacity, intesify, government, revive, auction, construction, grid, infrastructure, barriers







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind
  • Newlist_logo.windfair-us
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020