2024-12-22
https://w3.windfair.net/wind-energy/news/32840-siemens-gamesa-lekela-egypt-wind-farm-tubrine-service-agreement-maintenance-ppa-construction

Siemens Gamesa to Supply Egyptian 250 MW Wind Farm with Turbines

Lekela’s 250 MW West Bakr Wind project will be equipped by Siemens Gamesa and generate 1,000 GWh per year

Official Press Release Siemens Gamesa:

Siemens Gamesa helps Egypt’s renewable energy capacity drive through construction of Lekela’s 250 MW West Bakr Wind project

Wind Industry Profile of
Siemens Gamesa helps Egypt’s renewable energy capacity drive through construction of Lekela’s 250 MW West Bakr Wind project

West Bakr Wind project will generate 1,000 GWh per year and will increase the country’s installed wind energy capacity by 18% / Siemens Gamesa will install 96 SG 2.6-114 turbines and maintain them for 15 years / 70% of the project construction scope will be delivered by local subcontractors

Siemens Gamesa has pledged its further commitment to the growth of clean energy in Egypt through the construction of the 250 MW West Bakr Wind project which is owned by the renewable power generation company Lekela. Siemens Gamesa will install 96 SG 2.6-114 turbines through a turnkey EPC contract and will provide long term maintenance through a 15-year service agreement. Alfonso Faubel, SGRE Onshore CEO, said: “We are proud to have been selected to contribute to the... ... More: Official Press Release Siemens Gamesa

Keywords:
Siemens Gamesa, Lekela, Egypt, wind farm, tubrine, service agreement, maintenance, PPA, construction







Thematically suitable Windfair.net members in the business directory

  • Newlist_kaeufer_logo
  • Newlist_logo.drakawind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020