2024-11-22
http://w3.windfair.net/wind-energy/news/31390-van-oord-norther-belgium-installation-wind-turbines-offshore-wind-farm-contract-aeolus

Van Oord Completed Installation of Belgium’s Largest Offshore Wind Farm

Van Oord has successfully installed the last of the 44 wind turbines of the Norther offshore wind farm in Belgium last week.

Van Oord was contracted as main contractor. The entire scope, from cable installation and burial, installation of the Offshore High Voltage Station (OHVS) to turbine installation, was completed ahead of schedule and in less than 9 months. Van Oord deployed a wide range of equipment at the project, amongst others offshore installation vessel Aeolus, the newest trencher Dig-It and cable-laying vessel Nexus.

"The achievement of completing such a complex scope of work in this time frame, is something that all involved on this project can be proud of," said Floren Verweij, Project Manager Van Oord.

The 370 megawatt offshore wind farm supplies almost 400,000 households with renewable energy. The Norther offshore wind farm will contribute significantly to Belgium meeting its target of generating 13% of its energy needs from renewable sources by 2020.

Source:
Van Oord
Author:
Press Office
Keywords:
Van Oord, Norther, Belgium, installation, wind turbines, offshore, wind farm, contract, Aeolus




Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.windfair-us
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020