2018-07-22
http://w3.windfair.net/wind-energy/news/28721-nordex-abo-wind-developer-turbine-wind-speed-rotor-sweep-energy-yield-light-wind

ABO Wind Orders Lite-Wind Turbines by Nordex

Image: NordexImage: Nordex
The two N149/4.0-4.5 turbines, each with a nominal output of 4.5 MW, will be placed at the "Wennerstorf II" wind farm in the north of Germany.
Keywords:
Nordex, ABO Wind, developer, turbine, wind speed, rotor sweep, energy yield, light-wind

ABO Wind orders N149/4.0-4.5 turbines

Wind Industry Profile of
ABO Wind orders N149/4.0-4.5 turbines

Official Press Release Nordex:

The Nordex Group is supplying ABO Wind, an international project developer, with two N149/4.0-4.5 turbines, each with a nominal output of 4.5 MW, for the "Wennerstorf II" wind farm.

Less than eleven months have passed since the launch of this powerful turbine type and now building permission has been granted for the site to the south-west of Hamburg. Following its installation over the course of this year the Nordex group will conduct sound level and performance tests, among others, on the turbines, and this will form the basis of the IEC certification. This order also brings the total amount of wind... ... More: Official Press Release Nordex







Corr Members

  • Newlist_nordex_combined_logos
  • Newlist_logo.awea
  • Newlist_geonet_logo
  • Newlist_logo.lufft
  • Newlist_wpd-logo
  • Newlist_logo.windonthewires
  • Newlist_senvion-logo
  • Newlist_ge_net_logo
  • Newlist_logo.mesalands
  • Newlist_ge_monogram_blau_neu
  • Newlist_bmu_logo
  • Newlist_demag__company_logo_rgb_300dpi_20cm-1
  • Newlist_windeurope_primary_rgb
  • Newlist_eno_energy_ogo_claim
  • Newlist_logo.windkraft-gutachten
  • Newlist_rts_wind_ag_logo_652x312px
  • Newlist_ul_dewi_logo
  • Newlist_logo.doepel-landscape
  • Newlist_peikko_logo
  • Newlist_logo.argentinaeolica.org
  • Newlist_logo.moog

more results



Search by Keywords

© smart dolphin Gmbh 1999 - 2018 | Legal Notice | Windfair Editors | Privacy Policy