2024-12-22
https://w3.windfair.net/wind-energy/news/28647-acciona-australia-wind-farm-gellibrand-victoria-public-tender

Mount Gellibrand Wind Farm Up and Running

ACCIONA starts commissioning its fourth wind farm in Australia

Official Press Release ACCIONA:

ACCIONA starts commissioning its fourth wind farm in Australia

Wind Industry Profile of
ACCIONA starts commissioning its fourth wind farm in Australia

Mount Gellibrand (Victoria) features 44 wind turbines with a total capacity of 132 MW / An investment of around EUR165m (AUD258m) will take ACCIONA’s wind capacity in the country to 434.5 MW

ACCIONA has started the commissioning process of the 132-MW Mount Gellibrand Wind Farm, which has involved an investment of AUD258m in the state of Victoria (around EUR165M at current exchange rates). As the 44 turbines come online, energy production will ramp up to around 66MW in July, and to the full 132MW capacity in August. Total output will power approximately 60,000 homes. Mt. Gellibrand is equipped with Nordex AW125/3000 wind turbines with rated power of 3MW and a rotor diameter of 125 meters installed on an 87.5-metre-high (hub height) steel... ... More: Official Press Release ACCIONA

Keywords:
ACCIONA, Australia, wind farm, Gellibrand, Victoria, public tender







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.windfair-us
  • Newlist_logo.drakawind
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020