Posted by:
Vestas Plays with its 2 MW-Platforms
Official Press Release Vestas:
Vestas installs V120-2.0 MW prototype and introduces upgraded 2.2 MW version
Vestas is improving energy production for its 2 MW platform in low- and ultra-low wind conditions by installing a prototype V120-2.0 MW turbine with the ability to run in 2.2 MW Power Optimised Mode.
At the same time, Vestas is introducing an upgraded 2.2 MW nominal rating turbine that expands the 2 MW platform into medium to low wind conditions with high turbulence. Having announced the V120-2.0 MW turbine in the spring of 2017, the upgraded V120-2.2 MW includes a stronger gearbox and reinforced blades that strengthen performance in higher wind conditions. The V120-2.2 MW is globally applicable and designed for medium to low wind with higher turbulence conditions, which make the turbine a great fit for North America. The V120-2.0 MW prototype is operating... ... More: Official Press Release Vestas