2024-11-05
http://w3.windfair.net/wind-energy/news/27329-enel-brazil-wind-farm-commercial-operation-construction

Enel Brings Six Brazilian Wind Farms Online

The 172 MW Morro do Chapéu Sul wind facility in Brazil, consisting of six wind farms, has started commercial operation.

Official Press Release Enel Group:

Enel starts operations of 172 MW Morro do Chapéu Sul wind facility in Brazil

Morro do Chapéu Sul, located in the state of Bahia and composed of six wind farms, will be able to generate more than 830 GWh per year / Enel invested approximately 380 million US dollars in the construction of the new facility

Enel, through its Brazilian renewable subsidiary Enel Green Power Brasil Participações (EGPB), began operation of its Morro do Chapéu Sul wind facility, which has a total installed capacity of 172 MW and is located in the municipalities of Morro do Chapéu and Cafarnaum, in Brazil’s north-eastern state of Bahia. “The start of operations of Morro do Chapéu marks a new, important milestone in the consolidation of our wind footprint in Brazil, following the success obtained in the country’s A-6... ... More: Official Press Release Enel Group

Keywords:
Enel, Brazil, wind farm, commercial operation, construction







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind
  • Newlist_logo.windfair-us

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020