Posted by: Windfair Editors
ABS Group Hands Out Verification Certificate for Block Island
Official Press Release ABS Group:
ABS Group to Present Block Island Wind Farm Verification Certificate
ABS Group, the independent Certified Verification Agent (CVA) for the Block Island Wind Farm Project off Rhode Island, has issued a Verification Certificate to the Rhode Island Coastal Resources Management Council (CRMC) supporting the reliable operation of the first commercial wind farm in U.S. waters. The CRMC is the permitting agency responsible for overseeing that wind farm operations conform to state regulations.
The Block Island Wind Farm began commercial operations in December 2016, and the five-turbine wind farm is currently producing 30 MW at full capacity. As part of the CVA scope of work, ABS Group provided technical verification services to help confirm that the Block Island facilities had been designed, fabricated and installed in accordance with industry standards... ... More: Official Press Release ABS Group
- Keywords:
- ABS Group, USA, offshore, Block Island, verification