2024-03-19
http://w3.windfair.net/wind-energy/news/26685-windhoist-morocco-wind-farm-erecting-turbines

Windhoist Have Commenced Work on Aftissat Wind Farm in Morocco

Image: Windhoist (Said Neffati)Image: Windhoist (Said Neffati)
Windhoist will be erecting a total of 56 Siemens 3.6-130 x 100mhh wind turbines in the Western Sahara

Official Press Release Windhoist:

Windhoist Have Commenced Work In Morocco

Aftissat Wind Farm, Morocco

Windhoist are excited to announce that we have commenced work in Morocco. Windhoist will be erecting a total of 56 Siemens 3.6-130 x 100mhh wind turbines at the Aftissat wind farm which is 45km South of Boujdour in the Western Sahara – and only a short hop from Tenerife or Gran Canaria. The $391m wind farm is being developed for Société Energie Eolienne du Maroc (EEM) who will use the impressive 201.6MW of energy to supply industrial companies in Morocco. Windhoist would like to wish Eddie Wilson and his crew the best of luck with this exciting new project. Thank you to Said Neffati for the photo. ... More: Official Press Release Windhoist

Keywords:
Windhoist, Morocco, wind farm, erecting, turbines







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.labkotec
  • Newlist_eno_energy_ogo_claim
  • Newlist_agile_wind_power_logo1
  • Newlist_logo.tuev-sued-offshore
  • Newlist_ge_renewable_energy_blau
  • Newlist_ts_logo_rgb
  • Newlist_rosendahl_windtechnik_logo_weiss_neu_druck
  • Newlist_anemos_logo_neu
  • Newlist_logo.overspeed
  • Newlist_weidm_ller_ob_rgb
  • Newlist_prysmian_group_logo
  • Newlist_bwts_logo_2021
  • Newlist_deutsche_windtechnik_logo
  • Newlist_rts_wind_ag_logo_652x312px
  • Newlist_2019_softenergy_logo
  • Newlist_braun_windturbinen_logo
  • Newlist_geonet_logo
  • Newlist_woelfel_logo
  • Newlist_sabowind_logo
  • Newlist_logo.engr.wisc
  • Newlist_logo_idaswind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020