2024-12-22
https://w3.windfair.net/wind-energy/news/25781-pfisterer-jdr-east-anglia-one-connex-offshore

East Anglia ONE gets CONNEX grid system by PFISTERER

East Anglia ONE is the first large scale wind farm to be set up with this voltage level.

Official Press Release Pfisterer:

ScottishPower Renewables banks on 66 kV with CONNEX in the East Anglia ONE wind farm

Wind Industry Profile of
ScottishPower Renewables banks on 66 kV with CONNEX in the East Anglia ONE wind farm

In cooperation with British cable manufacturer JDR, PFISTERER has received the order for the delivery of CONNEX cast resin joints and CONNEX plug connectors for up to 72.5 kV for the networking of the new East Anglia ONE (EA1) wind farm

In the initial phase, the new wind farm includes the construction of 102 Siemens turbines with total output of 714 megawatts. Because of the high output level, the networking will take place with 66 kV. PFISTERER is the only manufacturer with a solution that has proven itself for 20 years in the offshore area. The new East Anglia ONE wind farm of operator ScottishPower Renewables is being constructed 43 km from the coast of Suffolk in the southern North Sea, and is in the axis between Amsterdam and London. With total output of 714... ... More: Official Press Release Pfisterer

Keywords:
Pfisterer, JDR, East Anglia ONE, CONNEX, offshore







Thematically suitable Windfair.net members in the business directory

  • Newlist_stiftung_offshorewind
  • Newlist_logo.weigt
  • Newlist_bmu_logo
  • Newlist_now_logo
  • Newlist_bwts_logo_2021
  • Newlist_logo.seaports
  • Newlist_bwo_logo
  • Newlist_ptmewlogo
  • Newlist_dynamica_ropes_logo_600x200
  • Newlist_logo.hodijcoatings
  • Newlist_logo.overspeed
  • Newlist_d_reb_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020