2024-12-22
https://w3.windfair.net/wind-energy/news/25600-edf-er-blyth-offshore-mhi-vestas

First foundation on its way to Blyth Offshore Wind Farm

Concrete gravity based foundations (GBFs) form part of the project and are being installed using a new “float and submerge” method – the first time this method has been used for offshore wind turbines.

Official Press Release EDF RE:

Blyth Offshore Wind Farm hits new Milestone

A pioneering wind farm development off the coast of Blyth has reached a notable milestone, with the first turbine foundation making its journey up the River Tyne on route to its final destination.

EDF Energy Renewables is currently building the Blyth Offshore Demonstrator Wind Farm after taking over responsibility for the scheme from Narec (now ORE Catapult) in October 2014.   The project will see five wind turbines with a total generating capacity of 41.5MW installed around 6.5km off the coast of Blyth. Once operational, they will generate enough low carbon electricity to power around 34,000 homes. Concrete gravity based foundations (GBFs) form part of the project and are being installed using a new “float and submerge” method – the... ... More: Official Press Release EDF RE

Keywords:
EDF ER, Blyth, offshore, MHI Vestas







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_stiftung_offshorewind
  • Newlist_kaeufer_logo
  • Newlist_logo.weigt
  • Newlist_bmu_logo
  • Newlist_logo.rotor-energy
  • Newlist_now_logo
  • Newlist_bwts_logo_2021
  • Newlist_logo.seaports
  • Newlist_bwo_logo
  • Newlist_ptmewlogo
  • Newlist_dynamica_ropes_logo_600x200
  • Newlist_logo.hodijcoatings
  • Newlist_logo.overspeed
  • Newlist_d_reb_logo
  • Newlist_owemes_logo
  • Newlist_radolid_logo
  • Newlist_8.2_logo_original_twocoloured_screen

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020