2024-12-22
https://w3.windfair.net/wind-energy/news/23162-moventas-gears-uk-mw-full-load-test-facility-open-for-business

News Release from windfair.net

List_windfair_logo_pos

Wind Industry Profile of


Moventas Gears UK - MW Full Load Test Facility Open for Business

Moventas Gears UK is pleased to announce the achievement of a significant milestone with the completion of the 3.6MW Load Test Bench and MW Final Assembly centre during August 2016.

The gearbox specialist has made a capital investment in the 3.6MW Load Test Bench, flexibly designed to accommodate Moventas’ multi-brand service approach. Supported by the UK government, the Huddersfield upgrade is part of a Regional Growth Fund initiative. The Test Bench is now operational and ready to support customers with their multi-brand MW requirements. The dedicated MW Final Assembly centre also provides the latest workshop procedures and engineering capabilities to serve this growing multi-brand market.

Moventas is the first gearbox service partner in the UK to provide multi-megawatt full load testing, which is an essential part of most gearbox service operations. From now on, serviced gearboxes no longer need to be sent to mainland Europe for testing, which minimises logistics costs and the carbon footprint.

With 35 years of wind turbine gearbox experience, industry leading technology and state of the art manufacturing facilities, Moventas is ideally placed to support the servicing of the UK installed base of wind turbines from its modern, well equipped service facility in the centre of the country. “I am proud to say that the UK wind industry can really benefit from our highly qualified service team, experienced in the service and repair of gearboxes for all makes of MMW wind turbines”, comments Chairman of the Moventas Board, Jim McColl of Clyde Blowers.

Moventas can service as many as 20 different turbine brands’ gearboxes covering over 60 models. Focusing on the MW fleets, Moventas UK covers a large aspect of the market including Vestas V80 and V90, Senvion MM82 and MM92, Nordex N80 and N90 as well as the Siemens 2.3 and 3.6 turbines.  Moventas UK’s field service team routinely performs a wide range of up-tower inspection and service repairs and upgrades. The Moventas CMaS Condition Management System is used world-wide to provide 24/7 performance monitoring and asset management across its own portfolio of gearboxes and the multi-brand drive trains.

Moventas’ objective is to extend gearbox life on existing fleets, innovate with new gearbox technology for next generation turbines and drive down O&M costs to reduce the total cost of ownership.

Source:
Moventas
Link:
www.moventas.com/...
Keywords:
Moventas, gear, UK, load test bench, assembly



All news from windfair.net

List_windfair_logo_pos

news in archive


Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.mts
  • Newlist_dynamica_ropes_logo_600x200
  • Newlist_logo_nordgreif_gmbh_-_transparent
  • Newlist_logo.aero_dynamik_consult
  • Newlist_windrad_logo-1-rgb
  • Newlist_logo.dokka-fasteners
  • Newlist_pce-instruments-logo-300dpi
  • Newlist_logo_idaswind
  • Newlist_lap_logo
  • Newlist_hytorc_logo_1
  • Newlist_logo_gedore_de_cmyk_blue
  • Newlist_logo.addinol
  • Newlist_mpt_logo
  • Newlist_windconsult-logo
  • Newlist_hoffmeier_logo_links_172_1820x_
  • Newlist_logo.hawart
  • Newlist_logo.maschinendiagnose
  • Newlist_schaeffler_logo
  • Newlist_reyher
  • Newlist_logoschwarzelektromotoren
  • Newlist_prysmian_logo_rgb

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020