2024-11-05
http://w3.windfair.net/wind-energy/news/22048-belgium-scour-protection-finished-on-nobelwind-project

News Release from windfair.net

List_windfair_logo_pos

Wind Industry Profile of


Belgium: Scour protection finished on Nobelwind Project

On 08/06 the works for the installation of scour protection (First phase) around the 51 foundations of the Nobelwind project are finished.

The erosion protection consists of a light filter layer (first phase) and a heavier coating layer specifically designed for various locations and water depths. This protection will remain stable for the next 25 years both in deeper than shallower zones.

 

 

 

Source:
Parkwind
Link:
press.parkwind.eu/...



All news from windfair.net

List_windfair_logo_pos

news in archive





Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020