Germany: 8.2 Consulting to perform first full campaign of periodic inspections for OWF Meerwind Süd | Ost
This puts WindMW in line with recommendations of approving authority BSH. This recommendation, which is expected to become mandatory soon, foresees inspections on 25% of all turbines each year in order to confirm operational safety.
“In 8.2 Consulting AG we have found a reliable partner for our project”, states Stefan Klett, General Manager of WindMW. “We value their outstanding expertise and have built a constructive business-cooperation during the course of the project”.
8.2 is involved with Meerwind since 2010; from initial design review of the WTG over quality assurance along assembly of all WTG up to inspection after commissioning.
Founded in 2006, the 8.2 Consulting AG quickly became a main player in the field of offshore wind. Being involved in more than 70% of all German offshore projects, 8.2 is the reliable partner of every quality oriented developer.
- Link:
- www.8p2.de/...