2024-12-22
https://w3.windfair.net/wind-energy/news/21297-uk-vbms-awarded-inter-array-cabling-contract-for-walney-extension-owf

News Release from windfair.net

List_windfair_logo_pos

Wind Industry Profile of


UK: VBMS awarded inter-array cabling contract for Walney Extension OWF

VBMS has been awarded a contract by DONG Energy for the installation of 87 inter-array cables for the Walney Extension offshore wind farm (OWF).

The total scope of work for VBMS will consist of (route) engineering, a pre-lay grapnel run, cable transport, cable installation & trenching. The project will be executed by VBMS’ in-house owned and operated cable-laying vessels and trenching tools.

Walney Extension

The Walney Extension OWF will have a maximum capacity of 660 MW and is located approximately 19 kilometres off the west coast of England, next to the 367.2 MW Walney 1 & 2 offshore wind farms, for which VBMS installed the export and inter-array cables between 2009 and 2011.

Source:
VBMS
Link:
www.vbms.com/...



All news from windfair.net

List_windfair_logo_pos

news in archive





Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020