2024-12-22
https://w3.windfair.net/wind-energy/news/20807-uk-successful-repair-for-london-array-leads-to-further-work-for-the-subsea-hydraulic-cable-grab

News Release from windfair.net

List_windfair_logo_pos

Wind Industry Profile of


UK: Successful repair for London Array leads to further work for the Subsea Hydraulic Cable Grab

Pharos Offshore successfully completed a diver-less export cable repair for London Array using the Subsea Hydraulic Cable Grab.

Basslink, a subsea cable connecting George Town in Tasmania and Loy Yang in Victoria, has a possible fault with the cable which is approximately 100km off the Tasmanian coastline in Bass Strait. Using the Subsea Hydraulic Cable Grab and a team of personnel from Pharos, the cable will be recovered for repair. Pharos delivered a work package with the rapid mobilisation of Expertise, Equipment to locate, and recover the subsea cable.

Reacting quickly to customer requirements the system was prepared and shipped within 2 days.

Source:
Pharos Offshore
Link:
www.pharosoffshoregroup.com/...



All news from windfair.net

List_windfair_logo_pos

news in archive





Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020