2024-12-27
https://w3.windfair.net/wind-energy/news/20444-netherlands-lagerwey-supplies-turbines-for-wind-farm-nijmegen-betuwe

News Release from windfair.net

List_windfair_logo_pos

Wind Industry Profile of


Netherlands: Lagerwey supplies turbines for wind farm Nijmegen-Betuwe

On Monday, 14 December 2015, wind turbine manufacturer Lagerwey and Foundation Wiek-II signed the final contract for the supply of four wind turbines, each 2.5 MW, for wind farm Nijmegen-Betuwe.

Construction will start in April and the first wind energy will be produced in September 2016.

Aart van de Pol signed the contract on behalf of Lagerwey. Ben Dankbaar (chairman Windpower Nijmegen) Pim de Ridder and Volkert Vintges (both from foundation Wiek-II) signed the cooperation agreement on behalf of Windpark Nijmegen-Betuwe BV.

Sustainable energy for 7,000 households

De Ridder is very pleased with choosing Lagerwey as the supplier: “Lagerwey is a good partner for wind farm Nijmegen-Betuwe. Their turbines are a perfect fit for the intended location and we expect that the machines will contribute significantly to the energy transition of Nijmegen. Together, the four wind turbines will supply 7,000 households with green energy. ”

Based on extensive criteria, it was decided that Lagerwey will supply the turbines. Lagerwey expressed willingness to invest in the preparation costs of the wind farm. Moreover, Lagerwey wants to help actively to realize plans for a Green Central (a sunbathing area with connection to the heat).

Source:
Lagerwey
Link:
www.lagerweywind.nl/...
Keywords:
Windpark



All news from windfair.net

List_windfair_logo_pos

news in archive





Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020