News Release from windfair.net
Wind Industry Profile of
08/11/2015
Germany: First turbine on Gode Wind
The installation went according to plan and SEA CHALLENGER will continue to install the rest of the 97 Siemens 6MW turbines. The vessel carries 4 turbines at a time and loading port is Esbjerg in Denmark.
Master Brian Bendixen was very satisfied after the installation;
“I am happy to be part of the team SEA CHALLENGER ( SIEMENS / DONG / A2SEA ). And I would like to send many thanks to all the crew members. After end installation, SEA CHALLENGER will return to Esbjerg Tuesday night for retrofit of equipment before starting next load out.”
- Source:
- A2SEA
- Link:
- www.a2sea.com/...