2024-11-05
http://w3.windfair.net/wind-energy/news/19063-germany-vbms-replaced-defective-cable-at-trianel-windpark-borkum-phase-2

News Release from windfair.net

List_windfair_logo_pos

Wind Industry Profile of


Germany: VBMS replaced defective cable at Trianel Windpark Borkum phase 2

VBMS completed the repair of an inter-array cable at Trianel Windpark Borkum phase 2.

The scope of work included the removal of the defective cable, and installation, burial, terminations and testing of a replacement cable.  The vast experience of the vessel crew with both export and array cable installation over the last 6 years resulted in the total operation taking less than 48 hours, from arrival to departure. The works were executed in the German Bight by cable-laying vessel Stemat Spirit.

Total solutions

VBMS CEO Arno van Poppel: “We are very pleased that besides installation projects, we are partnering with more and more clients on repair projects. With this cable repair contract, both Trianel and the insurance companies have shown their confidence in VBMS as a total solutions provider.”

Source:
VBMS
Link:
www.vbms.com/...



All news from windfair.net

List_windfair_logo_pos

news in archive





Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020