2024-11-22
http://w3.windfair.net/wind-energy/news/14554-vestas-news-edc-in-talks-with-vestas-to-make-burgos-wind-farm

News Release from Vestas

No_logo

Wind Industry Profile of


Vestas News - EDC in talks with Vestas to make Burgos wind farm

Energy Development Corp (EDC) plans to reinforce its Burgos wind farm in Ilocos Norte so it can withstand strong typhoons

In a recent forum, EDC executive vice president Ernesto B. Pantangco said the company is keen on strengthening the 87-megawatt Burgos wind farm given the “new norm” when it comes to typhoons.

“We are currently in discussion with our turbine supplier to see how we can reinforce the wind turbines. But admittedly that will involve lots of discussions because this is one of the firsts,” he said, referring to the strong winds brought by Typhoon ‘Yolanda’.

Denmark’s Vestas Wind Systems AS is supplying the 29 units of three-megawatt wind turbines at the $300 million Burgos project.

The wind turbines are the highest of their class, able to withstand winds of 240 kilometers per hour (kph).
Yolanda supposedly brought winds of between 300-400 kph.

Pantangco said the Burgos wind farm’s location insulates it from the brunt of typhoons, which weaken as they pass from the east in the Cordilleras, but added that “the new norms are still something we have to look into.”

The wind farm will rise next year on a 600-hectare site covering three barangays, namely, Saoit, Poblacion and Nagsurot.

The Burgos project marks EDC’s foray into the wind energy business and once completed will be the largest in the Philippines.

Source:
Posted by Trevor Sievert, Online Editorial Journalist / By Vestas Central EuropeStaff
Author:
Vestas Central Europe
Email:
vestas-centraleurope@vestas.com
Link:
www.vestas.com/...



All news from Vestas

No_logo

news in archive





Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020