09/14/2012
AREVA Wind unveils new offshore installation method
Bremerhaven, 14.09.2012. The production of climate friendly energy offshore will be increasingly important in the next years. This will create new challenges for the technology and logistics. The conditions offshore are significantly different to sites onshore. New solutions have to be developed to expand the energy production offshore, to reduce costs and to offer project developers a for their specific wind farms needs optimized solutions. With the M5000 wind turbine AREVA Wind has a proven product which is specifically designed for these conditions. One result of our constant improvement efforts is the single blade installation method which AREVA Wind is revealing for the first time at Husum trade fair. We would like to invite you to get in contact with AREVA Wind (represented by CEO Jean Huby) and Liftra representatives responsible for the Blade Dragon. Take up the opportunity to ask questions and to take pictures.
Date: 09/18/12
Time: 3 pm
Ort: Husum WindEnergy Fair and Congress Center at our Booth 2A07
Date: 09/18/12
Time: 3 pm
Ort: Husum WindEnergy Fair and Congress Center at our Booth 2A07
- Source:
- AREVA Wind
- Author:
- Heike Winkler
- Email:
- info.arevawind@areva.com
- Link:
- www.areva-wind.com/...