2017-05-26
http://w3.windfair.net/wind-power/turnkey

Wind Energy Keyword: "turnkey"

Classified Directory

  • Newlist_sabowind_logo
    Sabowind GmbH
  • Newlist_logo.bzee
    BZEE Academy GmbH
    ... of the Industry's international workface. BZEE's engineering section designs full-scale wind energy training equipment and delivers turnkey wind energy training centres worldwide. ...
  • Newlist_logo.ventotec
    Ventotec GmbH
  • Newlist_logo.nordex
    Nordex SE
    ... farm, through turnkey installation down to service. The "Nordex Academy" provides a high level of training to all our staff, guaranteeing...
  • Newlist_logo.lidar
    Leosphere
    ... Leosphere is specialized in LIDAR (Laser – Radar) atmospheric observations. The company offers turnkey and user friendly remote sensing...
  • Newlist_wkn_logo
    WKN AG
    ... WKN AG has planned, installed and operated turnkey wind farms in Germany since 1990. In addition, WKN AG is internationally represented...
  • Newlist_windhunter_gmbh_logo
    Windhunter
    ..., production and turnkey installation of the mast and measurement system, operation, maintenance, and dismantling at the end of the measurement campaign...
  • Newlist_wago_logo
    WAGO Kontakttechnik GmbH & Co. KG
    ... earned an enviable reputation as a reliable industry partner. In fact, the company has developed and implemented customized turnkey solutions for its major customers that are operating on a global scale in various industries. ...
  • Newlist_ge_net_logo
    Ge:Net GmbH
    ... Ge:Net offers turnkey wind measurement masts including measurement system as well as installation and dismantling service. The wind potential can...
  • Newlist_ela_logo
    ELA Container Offshore GmbH
  • >> more results

Products

Projects

Services

Latest News

  • Newlist_senvion-logo
    Senvion concludes five orders in Belgium totaling 45 megawatts 10.05.2017
    ... project, located in Walloon and developed by Ventis S.A, has been agreed on a turnkey basis with Senvion responsible for the foundation works...
  • Newlist_nkt_logo_blue
    NKT names its state-of-the art cable-laying vessel NKT Victoria 05.05.2017
    .... The act was carried out by the regional Governor of Blekinge and marks the starting point of a new era of NKT turnkey high-voltage offshore cable system...;turnkey solutions offering With the vessel, NKT completes its high-voltage AC/DC power cable system offering to include planning, design, manufacturing...
  • Newlist_ge_renewable_energy_logo_blau
    GE, Borusan EnBW Enerji, Fina Enerji and Özgül Holding Sign MoU for YEKA in Turkey 11.03.2017
    ... management, engineering solutions and energy portfolio management, Özgül Holding has so far offered turnkey solutions for around 10 wind energy...
  • Newlist_prysmian_group_logo
    Ahead of schedule in the realisation of the Wikinger OWF 03.03.2017
    ... in the offshore wind market, highlights the Group’s capabilities in managing turnkey inter-array contracts and re-affirms the strong focus Prysmian has... electricity to 285,000 households from the Belgian North Sea. Prysmian has also provided turnkey HVAC cable systems for various offshore wind farms...
  • Newlist_prysmian_group_logo
    New interconnector between France and the UK 24.02.2017
    ... underground cable turnkey system that includes the engineering, production and installation of one HVDC symmetrical monopole circuit along a 51 km...
  • Newlist_logo.siemens
    Siemens overdelivers on promise in Egypt megaproject 01.02.2017
    .... And by doing so, we not only overachieved in performance, we also broke all records in modern turnkey power plant construction. This was only possible... Construction, Siemens is supplying on a turnkey basis three natural gas-fired combined cycle power plants, each with a capacity of 4.8 GW, for a total...
  • Newlist_nexans_logo
    Nexans connects British offshore wind farm to shore 18.01.2017
    ... km2 site. The turnkey contract includes a pre-installation survey and cable protection by burying. Delivery of the cables will begin in Summer 2018...
  • Newlist_ela_logo
    Positive year for ELA Offshore 21.12.2016
    ... Gatzemeier. "Many customers appreciate a turnkey solution to keep a project clearly arranged and processed in-house easier as well as faster. Just... with 10 m length and 3 m width were build according to customer’s specification within only 2 months and turnkey assembled on an offshore...
  • >> more results

Search by Keywords

© smart dolphin Gmbh 1999 - 2017 | Legal Notice | Windfair Editors