2024-04-20
http://w3.windfair.net/wind-energy/pr/13201-res-completes-the-grange-wind-farm

News Release from Renewable Energy Systems Group (RES)

No_logo

Wind Industry Profile of


RES completes The Grange Wind Farm

Construction work started in January 2012 and the turbine components were delivered to site 12 months later. All seven turbines were erected, and the grid connections energised

RES completes The Grange Wind FarmRES completes The Grange Wind Farm

Renewable Energy Systems is celebrating the completion of The Grange Wind Farm, which lies between Sutton Bridge and Tydd St Mary in Lincolnshire.

At 14MW, the wind farm is capable of generating enough clean, green renewable electricity to meet the average needs of more than 10,000 homes.

Construction work started in January 2012 and the turbine components were delivered to site 12 months later. All seven turbines were erected, and the grid connections energised, by the end of March 2013, since when commissioning and testing of the turbines has been taking place.

RES owns and operates The Grange Wind Farm and looks forward to continuing the links forged with the local community during the development and construction phases.

Source:
Renewable Energy Systems Group
Author:
Posted by Trevor Sievert, Online Editorial Journalist / By RES Staff
Email:
info@res-ltd.com
Link:
www.res-ltd.com /...



Alle Meldungen Von Renewable Energy Systems Group (RES)





Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020