2024-04-27
http://w3.windfair.net/wind-energy/news/44643-seaway7-east-anglia-3-contract-scottishpower-renewables-transport-installation-foundations-inter-array-cables-pba-capacity-uk

Seaway7 awarded transport and installation job for East Anglia 3 OWF

Image: Seayway7Image: Seayway7
Seaway7’s scope of work includes the transport, logistics and installation of 95 monopile foundations, associated seabed preparation and scour protection along with the engineering, supply and installation of the 95 inner-array cables.

Official Press Release Seaway7:

Seaway7 awarded East Anglia 3 contract

Seaway7, part of the Subsea7 Group, today confirmed the award of a very large contract by ScottishPower Renewables for the transport and installation of the foundations and inner-array cables for the East Anglia THREE offshore farm. The award comes a year after the Preferred Bidder Agreement was announced

East Anglia THREE – located in the Southern North Sea, 69 kilometres off the Suffolk coast – will be the world’s second largest windfarm when it comes into operation in 2026.  Its 95 14.7MW turbines will have a combined capacity of 1,400MW, generating enough green electricity to power the equivalent of more than 1.3 million homes. Seaway7’s scope of work includes the transport, logistics and installation of 95 monopile foundations,... ... More: Official Press Release Seaway7

Keywords:
Seaway7, East Anglia 3, contract, ScottishPower Renewables, transport, installation, foundations, inter array cables, PBA, capacity, UK







Thematically suitable Windfair.net members in the business directory

  • Newlist_prysmian_logo_rgb
  • Newlist_roxtec-logo
  • Newlist_peikko_logo
  • Newlist_logo.helukabel
  • Newlist_energy_uk_logo
  • Newlist_wpd-logo
  • Newlist_logo.bergolin
  • Newlist_logo.weigt

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020