2024-04-24
http://w3.windfair.net/wind-energy/news/26096-jan-de-nul-export-cable-offshore-wind-farm-race-bank

Jan de Nul finishes Race Bank installation

Image: Jan de NulImage: Jan de Nul
Jan De Nul successfully installed two export cables in the UK

Official Press Release Jan de Nul:

Jan De Nul Group completes Race Bank export installation

After two successful installation campaigns in 2016 and 2017, Jan De Nul Group has reached an important milestone with the timely completion of the installation and burial of the export cables for DONG Energy’s  Race Bank Wind Farm in the United Kingdom.

Jan De Nul successfully installed two export cables of 70 km across England’s most important natural habitats and linked the two Offshore Substations with an interconnector of 6 km. To execute the nearshore works across the saltmarsh in the Wash, Jan De Nul Group developed and built the award-winning low ground pressure cable installation and burial tools Sunfish and Moonfish. Both machines were deployed from Jan De Nul’s cable installation barge DN120. Offshore cable installation vessel Isaac Newton... ... More: Official Press Release Jan de Nul

Keywords:
Jan de Nul, export cable, offshore, wind farm, Race Bank







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.weigt
  • Newlist_prysmian_logo_rgb
  • Newlist_logo.overspeed
  • Newlist_anemos_logo_neu
  • Newlist_ts_logo_rgb
  • Newlist_logo.labkotec
  • Newlist_bmu_logo
  • Newlist_windrad_logo-1-rgb
  • Newlist_logo.tuev-sued-offshore
  • Newlist_logo.helukabel
  • Newlist_geonet_logo
  • Newlist_logo.engr.wisc
  • Newlist_roxtec-logo
  • Newlist_rts_wind_ag_logo_652x312px
  • Newlist_bwts_logo_2021
  • Newlist_now_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024 | Legal Notice | Windfair Editors | Privacy Policy | The Windfair Pocket Wind 2020