2018-04-26
http://w3.windfair.net/wind-energy/news/24444-8-2-consulting-technical-due-dilligence-ewz-trianel-borkum-ii-wind-farm

8.2 Consulting AG Completes Technical Due Dilligence for Trianel Borkum II

Image: 8.2Image: 8.2
The consulting agency has successfully finished the technical due dilligence on the transaction of Swiss EWZ for offshore wind farm Trianel Borkum II
Keywords:
8.2, Consulting, technical due dilligence, EWZ, Trianel Borkum II, wind farm, Windpark

Successful technical due diligence by 8.2 Consulting AG

Official Press Release 8.2:

8.2 Consulting AG has successfully completed the technical due diligence on the transaction of Zurich utility EWZ together with Swiss asset manager Fontavis for Trianel Windpark Borkum 2 (TWB2)

Zurich utility EWZ together with Swiss asset manager Fontavis has bought a 24,5% stake in the 200 MW TWB2 offshore wind farm in the North Sea. EWZ will finance the purchase via a 187,5 Mio.  €  framework credit approved by the Zurich municipal council. The offshore wind farm could provide power for 39,000 Zurich households (105 GWh per year). ... More: Official Press Release 8.2







Corr Members

  • Newlist_tuev_nord_logo
  • Newlist_gewi
  • Newlist_logo.cte-wind
  • Newlist_logo.overspeed
  • Newlist_logo.bbb-umwelt
  • Newlist_abo_wind_logo
  • Newlist_logo.tuev-sued
  • Newlist_anemos_logo_neu
  • Newlist_logo.tuev-sued-offshore
  • Newlist_logo.softenergy
  • Newlist_geonet_logo
  • Newlist_logo.engr.wisc
  • Newlist_windwaerts_logo
  • Newlist_logo.abe-gruppe
  • Newlist_plan_8_logo_gross
  • Newlist_logo.vdi-wissensforum
  • Newlist_ul_dewi_logo
  • Newlist_logo.windonthewires
  • Newlist_deutsche_windtechnik_logo
  • Newlist_logo.hodijcoatings

more results



Search by Keywords

© smart dolphin Gmbh 1999 - 2018 | Legal Notice | Windfair Editors