Orders for 103 turbines totaling over 266 MW capacity / Turbines will go to 24 community wind farm projects in Schleswig-Holstein
Bald Hills wind project to be supplied with 52 MM92 turbines / Largest REpower EPC contract in Australia to date / Project scheduled for delivery in Q2 2014
Bigger rotor increases energy yield by 20% / Rated power of 6.15 megawatts and a rotor diameter of 152 metres / Prototype scheduled for installation in 2014
REpower Systems SE, a wholly owned subsidiary of the Suzlon Group - the world’s fifth-largest* manufacturer of wind turbines - will change its name in 2014: thereafter the company will be called Senvion.
REpower turbines generate enough wind energy for 18 million people / Takes total installations to over 9.6 GW of capacity worldwide
Onshore wind turbine REpower 3.0M122 with a rated power of 3.0 megawatts and a rotor diameter of 122 metres / Particularly cost-effective in low-wind locations thanks to the large rotor
“We are glad to renew the partnership with REpower"
Lars Rytter assumed COO role on 1 August / Russell Stoddart starts as CTO on 12 August / New Management Board of REpower Systems GmbH set up
C-Power’s Thornton Bank wind farm features 48 REpower 6M turbines / The 6M is the world’s largest commercial offshore turbine at 6.15 MW / Phase III: Installation of 18 REpower 6M wind turbines in time completed
The project consists of 75 REpower wind turbines (Suzlon) and represents one of two Quebec wind farms jointly owned by EDF EN Canada and Enbridge
Wind energy major Suzlon said its unit REpower Systems has signed contracts with ABO Wind for the supply of 13 wind turbines
REpower Systems, a Suzlon Group-subsidiary and leading manufacturer of onshore and offshore wind turbines, and Brgerwindpark im Kirchspiel Medelby GmbH & Co. KG have concluded a contract over 27 wind turbines for four projects totaling approximately EUR 9
- Cost reduction of EUR 100 million to be realised by FY13/14 - Savings potential identified in purchasing, production and manufacturing - Total employees likely reduced by up to 750 worldwide
REpower and wpd europe GmbH enter into contract for six projects
Suzlon Group subsidiary, REpower Systems SE, has concluded a contract with P.E. DEUS EX S.R.L., a project company (SPV) of WSB International GmbH, to deliver eight wind turbines to Romania.
Suzlon Group subsidiary REpower Systems SE and WSB Neue Energien GmbH signed a contract for the delivery and construction of 22 REpower MM92 wind turbines
The wind turbine manufacturer REpower Systems SE, a fully owned subsidiary of Suzlon Group, can look back on a successful time at HUSUM WindEnergy 2012, having concluded contracts for a total of almost 100 megawatts (MW) at the trade fair.
-Mt Mercer wind project to be supplied with 64 MM92 wind turbines -Company’s largest ‘supply & install’ contract in Australia to date -Project scheduled for delivery beginning in September, 2013
The wind turbines are supplied by REpower UK whose managing director, Rick Eggleston, commented that using Mabey Bridge for the Seamer installation made perfect sense
-World’s first wind farm with offshore turbines of the 6 megawatt dimension -Installation of 30 REpower 6M wind turbines completed on time -First turbines already commissioned
REpower Systems SE has signed projects with an overall capacity of more than 1 GW in the UK following today’s announcement of a further five onshore contracts.
-Largest turbine in terms of rotor diameter installed in Italy -First REpower project to be built in Sardinia -Installation and commissioning of three 3.2M114 turbines scheduled for second half of 2012
-First REpower 3.2M114 with a hybrid tower and 143 metre hub height delivers power -Up to 50 percent increase in yield possible at low-wind locations -Prelude for further projects in Germany
The Supervisory Board of REpower today appointed Mr Marcus A. Wassenberg as Chief Financial Officer, and Mr Vinod R. Tanti as Chief Operating Officer. These appointments are effective 1st June 2012.
Suzlon Energy Group subsidiary, REpower Systems SE announced its largest wind power order to-date in Poland with the 39 MW Nowy Staw wind farm, near the city of Gdansk / Official REpower Wind Energy Profile
REpower has signed a contract to supply Banks Renewables with six 3.4M104 wind turbines for their Penny Hill Wind Farm in South Yorkshire, England
-Construction start for 39 MW of installed capacity -Continuous expansion of Polish onshore wind pipeline -REpower supplies MM92 turbines rated at 2.05 megawatts each
In two press releases REpower will be introduced with regard to its (1) Wind Power Solutions, (2) Wind turbines, (REpower I) & (3) Integration and (4) Operation (REpower II)
Keyword Search